1. Scope and estimate
Everything starts with a written scope: which walls and ceilings, board type, finish level, protection, access, and what is excluded — painting or disposal, for example. Photos and measurements make this accurate.
2. Preparation and boarding
Framing is checked before board goes up: spacing, straightness, backing at corners. Ceilings are boarded before walls so wall board supports the ceiling edge, and every sheet is screwed at the correct spacing.
3. Taping and finishing
Joints are taped and coated in stages, each coat wider and thinner than the last, with drying time between them. Fasteners and corner bead get the same treatment, then everything is sanded to the agreed finish level.
This is the stage that takes the calendar time — a proper finish spans several days even in a small room.
4. Review
The finished surface is walked with you under normal lighting. Any remaining items are confirmed before the job is closed, and the surface is left ready for primer.